September 2024: A lead time that felt generous
On September 5, 2024, I signed the paperwork for an Olhausen pool table and sent it to finance. Ten weeks later, I paid $700 extra just to make sure the table arrived on time.
At the time, though, it felt like padding. Our company was opening a new office campus on November 15. Ten weeks. For an administrative purchasing project I'd been nudging along since summer, that seemed like room to breathe.
The plan was straightforward. A game corner with an Olhausen Belmont, kitted out with an Olhausen pool table dining top so the space could double as an informal meeting area. An outdoor ping pong table for the patio. A squat rack in the small gym—I went back and forth on squat rack home gym options for a while, eventually picking one that didn't require floor anchoring, which saved me a conversation with property management. And VIP client gifts. I spent a couple of evenings figuring out what the latest Beats headphones were, then settled on a noise-canceling model.
We picked Olhausen partly for the heritage craftsmanship story, partly for the Accu-Fast precision play surface. The cheapest option on our quote sheet was definitely cheaper. But a table that actually felt good to play on seemed like the difference between a game corner people used and one they walked past.
Everything looked fine on paper.
Late September: The "8 to 10 weeks"
The trouble started with the dining top.
Toward the end of September, our dealer sent a follow-up: the Olhausen pool table dining top is a custom piece. Lead time was 8 to 10 weeks, not the 6 to 8 weeks quoted for the table itself.
I redid the math. Best case, it lands November 14. The event is the 15th. Zero buffer.
For a few days, I seriously considered switching.
From the outside, going with a supplier that had a table in stock looked like the safer bet. The reality was that a cheaper in-stock table meant no custom dining top—and a room that couldn't double as anything but a pool room. For a space that small, flexibility was the whole point.
I almost went with the cheaper option anyway. Not just because of the price—because the date felt certain.
I stopped myself. I reminded myself that the deadline wasn't "as soon as possible." It was November 15. The launch. The invitations had already gone out. The VIP tour route went right past the game corner.
A missing game corner would land on my desk, and then on my operations director's desk, and then possibly on the CEO's radar during what was supposed to be a celebratory morning.
I called the dealer. We talked through the sequencing. They could split the shipment—table first, dining top after—but installation would have to wait for both pieces.
It wasn't clean. But it was clearer than switching.
October 28: "Should be there"
October 28, Monday morning. I'm at my desk, and the dealer's email lands: the table should be there November 13 or 14.
Should.
The most frustrating part of vendor management is exactly this: the same soft language that sounds helpful in the moment turns into a planning problem two weeks later. In 2022, we had a supplier pull the same move during a warehouse expansion—"should be fine" became two weeks late, and our quarterly all-hands almost had to be relocated.
I called the sales manager directly. We talked for about twenty minutes. He offered a path: $700 for rush production and priority freight, locking in November 11 delivery and November 12 installation.
Seven hundred dollars, against a lounge budget of roughly $12,000—maybe 5%, maybe 6%, I'd have to pull the spreadsheet to be sure. I keep mixing it up with the fitness equipment line, which had its own budget.
I sat with it for about half an hour.
I'll be honest: rush fees make me uncomfortable. Part of me sees them as a slight. That money could have bought a proper cue rack, or upgraded the patio lighting. And I didn't want to be the person who reaches for the expedite button every time a date gets tight.
But I couldn't make the other number work in my head. What does an empty game corner actually cost on launch day? The CEO's opening remarks route straight through it. The VIP tour route runs past it. Not to mention the weeks of internal email, the weekly check-ins with my operations director, the back-and-forth with the dealer about dates.
I approved it.
To be fair, their standard lead time is fine for most projects. It was this specific deadline that made the difference. When the deadline can't move, the cheapest quote is often the most expensive one.
November 11: The table arrives
November 11, morning. The Olhausen Belmont shows up. Three separate drops—legs, table, dining top—and the installers move in the same day. By November 12, it's fully assembled. The dining top lines up. The Olhausen pool cue set gets unpacked, tips installed. The game corner looks like a game corner.
A few other things landed in the final days: the outdoor ping pong table was mounted on the patio, the squat rack showed up two days behind schedule but before the event, and the VIP clients' Beats headphones arrived—one box had the wrong color and took three days to swap, but it made it.
November 15. Everything in place. The launch went fine. People actually used the game corner, which was the point.
I found out later that a few client tables ate lunch on the dining top without realizing there was a pool table underneath. That was probably the only time the accessory got used exactly as intended—and exactly why I'd pushed for it.
Postmortem: What I was actually paying for
I pulled the numbers again a few weeks later.
Seven hundred dollars against a $12,000 budget is a little over 5%. What was the cost of an empty game corner on launch day? The CEO's remarks route. The VIP tour route. The weeks of internal email and weekly check-ins with my operations director. None of that shows up in the original quote sheet.
People think expensive vendors deliver better quality. Actually, vendors who deliver quality can charge more. The causation runs the other way.
But there's a second layer that matters more: when a deadline is fixed, the question isn't which quote is lowest. It's which promises you can lock in.
I don't want to overstate this. Granted, the cheapest option is often fine. If the deadline is "whenever" rather than "that day," I'll absolutely take the cheaper route.
This wasn't that. The rush fee didn't buy speed. It bought certainty. And when the deadline can't move, certainty is the thing you're actually paying for.
This was accurate as of December 2024. Olhausen's lead times, pricing, and expedite policies may have changed—verify current terms with your dealer before signing the purchase order. The dining top's custom lead time also varies by model; mine was a Belmont, and other cabinet styles may quote differently.
If you asked whether I'd do it again: I'd put the custom dining top's lead time into the purchase order on day one, not back into it from the standard table's 6-to-8 weeks. And I'd ask about expedite options at the quoting stage—not because I like spending the extra money, but because sometimes "should be there" costs more than a clearly quoted rush fee.